Purchase Order
Entry
|
|
|

|
How can I insure accurate
vendor pricing when I issue a
PO?
The most current vendor price
(your cost) is tracked within the Vendor Tab of each item in your inventory. So that
when you create a PO, the vendor pricing is automatically established based on that item
& vendor combo. Same item, different vendor, different costs. But you can
always manually override the value during entry.
Back to
top
|
|
 |
How do I create a Blanket
PO? What if the original PO was from a long time
ago?
When you are adding a new PO, there is a Copy shortcut
enabled that automatically creates a PO based on a previously entered PO. In addition, you
can use the (date) Required by field within each line for scheduled
shipments due to you.
The original PO can either be an Open PO or one that was fully received from the PO
history file. So even if it was from several years ago, it can be used as a template.
Back to
top
|
|
|

|
I have one vendor I need
to keep an eye on -- he has a history of billing me more that he should on his
invoice. How can I flag him for "Special
Attention?"
You can add tight controls for a specific
vendor by defining the PO required field as Yes
within the Vendor Tab of the Name/Address record. Then when the A/P Invoice is
entered, the PO
lines, received quantities, amounts, freight agreements etc, must match or the A/P invoice
is placed on
“
Hold.
”
For a complete list of all required
matches and details of this feature, please refer to Appendix A of
the Purchase Order User's
Reference manual.
Back to
top
|
|
|

|
Can Down To Earth
track receivings into a main warehouse then transferred to a local
warehouse?
Yes. This is referred to as "Two-Step
Receivings." It is as simple as defining the RECVGSTYPE Control to be
2-step. The initial receiving is considered "At dock" first, then "On
hand."
Note: The receivings type must be the same within a DTE
Company. Should you decide to change type, make sure all current receivings are
completed and posted prior to
changing.
|
|
|

|
Can I use a scanner to
receive goods into the
warehouse?
Yes. Actually, the DTE receivings are designed for a scanner but
do allow keyboard input. Scan the PO, Scan the line, input the quantity
received and your done. You'll need to do a little bar code/UPC setup first
then you're on your way.
Back to
top
|
|